Interface bunker
Steep side walls in the bunker prevent bridge formation, slipping is ensured even when using wet materials. The use of a mechanical straight-line control automatically keeps the bunker belt in the desired position.
Secure Cleaning
The seventh drum is cleaned via a free-running round brush adjustable from below. Due to a placement opposite the screen side, there is minimal risk of contamination from the screening material
Perfect for Rough Seperations
The processing of earth excavation, gravel or light construction waste is made easy with a bunker screening solution preventing possible damage from huge impurities.